Projects: INDUSTRIAL DIVISION & SERVICES - VENEZUELA

  • Fuel Supply, Distribution and Storage (SUMANDES). PETRÓLEOS DE VENEZUELA S.A. Andean region

    Client: PETRÓLEOS DE VENEZUELA S.A.
    Scheme: JV with INELECTRA S.A.
    Year: 1997-2000

    Construction of the storage and distribution system for refined products (medium and high gasoline, diesel, kerosene, Jet-A1 and residue) from Bajo Grande marine terminal to San Lorenzo, Zulia state, and El Vigía, Mérida state. Includes, among others, remodeling of Bajo Grande and San Lorenzo plants; a lake/land pipeline San Lorenzo-South Shore Lake Maracaibo-El Vigía; main pumping station in San Lorenzo; construction of El Vigía plant; construction and adaptation of 53 storage tanks; design of 14 filling islands, and adaptation of dock and loading platforms in Bajo Grande.

  • Fuel Supply System (SISOR). PETRÓLEOS DE VENEZUELA S.A. Southeastern region

    Client: PETROBRAS S.A.
    Scheme: JV with AESA S.A.
    Year: 1999

    Construction of a fuel distribution system (high and medium gasoline, diesel and Jet-A1) from Puerto La Cruz Refinery to the new Fuel Storage and Distribution plants located in the consumption centers of Puerto La Cruz, San Tomé, Maturín, Puerto Ordaz, Ciudad Bolívar and Puerto Ayacucho. Includes a 590 km pipeline network to interconnect the plants.

  • Olefins plant remodeling - Phases I. PETRÓLEOS DE VENEZUELA S.A. El Tablazo, Zulia state

    Client: CAPEX S.A.
    Scheme: JV with INELECTRA S.A. &  M.W. Kellogg
    Year: 2003-2005

    Phase I: Construction and assembly, readiness and assistance with startup of the remodeling of the Olefins plant of the El Tablazo Petrochemical Complex to increase ethylene production capacity to 170,000 MTY. Includes Class II cost estimate for second phase of project.

  • Olefins plant remodeling - Phases II. PETRÓLEOS DE VENEZUELA S.A. El Tablazo, Zulia state,

    Client: TOTAL AUSTRAL S.A
    Scheme: JV with INELECTRA S.A. &  M.W. Kellogg.
    Year: 1999-2001

    Phase II: Construction and startup of modification of the Olefins plant to increase ethylene production capacity from 170,000 to 250,000 MTY, and propylene from 70,000 to 127,000 MTY, maximizing use of existing facilities in an effort to minimize investment costs.

  • Crude Oil and Wastewater Treatment at Rucio Viejo Plant TOTAL VENEZUELA. Jusepín, Monagas State

    Client: TOTAL AUSTRAL S.A
    Scheme: JV with PDI S.A.
    Year: 2002-2003

    Increasing Oil Cooling Capacity, construction, evaluations, and structural repairs. Construction of the Production Water Treatment Plant. Construction of Production Facilities and new Sand Trap in the Process Area.

Photo Gallery

We offer the following pictures that belongs to these projects. You can see the image enlarged clicking on the thumbnails.

  • Industrial Services - Venezuela
  • Industrial Services - Venezuela
  • Industrial Services - Venezuela
  • Industrial Services - Venezuela
  • Industrial Services - Venezuela
  • Industrial Services - Venezuela
  • Industrial Services - Venezuela
  • Industrial Services - Venezuela
  • Industrial Services - Venezuela
  • Industrial Services - Venezuela

Other countries: Argentina Spain

© ARENA NEWMAN, 2011 · All Rights Reserved

Legal Advices and Privacy Policy | Developed by lahuella comunicación